THE DOME, DONCASTER

Leisure

PROJECT DETAILS

The Dome, Doncaster (Doncaster Culture and Leisure Trust) is benefiting from our On-Site Utility Solution. Previously, the site had an out of service CHP unit. Whilst it hadn’t been a priority to replace and remove the old unit, this changed when the Trust identified that using CHP to generate electricity on site would avoid the CRC. We removed the old system and installed a new engine that was specified for its very high electrical efficiency.

Facilities:

Split level ice rink

Swimming complex

Large children’s playzone

Leisure and health facilities

Large scale conference and exhibition spaces

Bar and restaurant

Forecast gross CO2 saved

Forecast energy saving

Forecast electricity generated

Forecast heat generated

GOALS

Reduce operating costs 

Electricity - lighting and power for public areas, bedrooms and leisure centre facilities
Heat - hot water production for swimming pools, leisure facilities and space heating
Air conditioning systems - used to keep rooms and the whole complex cool

CHALLENGES

Size of site and variety of facilities

Due to the size of the site and the variety of facilities that are provided, energy usage, without proper management, can easily spiral out of control
Removal and disposal of an old, inoperative CHP solution
Installation of the CHP solution and removal of the old system was challenging due to limited plant room access

SOLUTIONS

Implemented: On-Site Utility Solution

Combined heat and power (CHP)
Roller shutter door to provide access for system removal and installation

Request a callback today and a member of the team will be in touch or you can FIND OUT MORE