WhoshouldIsee Tracks

PROJECT DETAILS

The Celtic Manor Resort was looking for a solution that would provide a discount against its import electricity and heat tariffs. The implementation of a EuroSite Power On-Site Utility Solution over 15-years provided the answer. The result? Actual system performance is greater than forecast, and as a result, The Celtic Manor Resort is currently outperforming initial savings projections.

Facilities:

  • Four hotel complexes (554 guest rooms)
  • Convention centre
  • 3 health clubs with spa facilities
  • 8 restaurants
  • 3 Championship golf courses

DOWNLOAD CELTIC MANOR CASE STUDY PDF

Gross CO2 saved from Jan ’17 to Mar ’22
Energy saving from Jan ’17 to Mar ’22
Electricity generated from Jan ’17 to Mar ’22
Heat generation from Jan ’17 to Mar ’22

GOALS

Reduce operating costs

Electricity – lighting and power for public areas, bedrooms, and hotel facilities

Heat – hot water production for space heating and leisure facilities

Air conditioning systems – used to keep rooms and whole complex cool

CHALLENGES

Size and complexity of the site

Seasonal energy demand and limited locations to install plant

Machinery required a modular approach

Internal plant location

Exhaust outlet had to be invisible to guests

SOLUTIONS

Implemented: On-Site Utility Solution

2 x 200 kilowatt combined heat and power systems (CHPs)

Silent enclosures to minimise noise breakout

Fan assisted exhaust system routed away from hotel complex

“The EuroSite Power solution has provided us with immediate cost and carbon emission savings over and above what was initially projected. We are delighted our partnership will continue to reduce our carbon footprint and allow us to continue to provide the best value to our customers for the next 15 years.”

Russell Phillips

VP Facilities and Development
Request a callback today and a member of the team will be in touch or you can