THE ABILITY GROUP (HILTON HOTELS)

Hospitality

Project Details

The Ability Group sought a solution to deliver operational savings at four locations in its UK portfolio. The implementation of combined heat and power (CHP) technology – fully funded by our On-Site Utility Solution over an extended 30 year contract –  is now delivering economic, operational and environmental benefits at all four sites. This arrangement guarantees direct energy cost savings by generating a substantial portion of the required electricity and heat at each of the sites. Crucially, the CHP systems are owned, operated and maintained by EuroSite Power – thus resulting in zero capital and resource expenditure for The Ability Group.

Facilities:

DOWNLOAD ABILITY GROUP CASE STUDY PDF

Forecast gross CO2 saved

Forecast energy saving

Forecast electricity generated

Forecast heat generation

GOALS

Reduce operating costs

Electricity – lighting and power for public areas, bedrooms, and hotel facilities

Heat – hot water production for space heating and leisure facilities

Air conditioning systems – used to keep rooms and whole complex cool

CHALLENGES

Wide range of facilities operating 24/7

Constant energy usage due to the range of facilities offered and the 24 hour nature of the portfolio

Need for installed equipment to be quiet in operation to avoid disturbing guests

Integration with the wide range of electrical and heating systems found across the hotel portfolio

SOLUTIONS

Implemented: “EuroSite Power On-Site Utility Solution”

Combined heat and power (CHP)

“We liked EuroSite Power’s approach because it required no capital investment and guaranteed us a saving, whatever happens to energy prices in the future”

The Ability Group

Head of Hotel & Leisure Division

Request a callback today and a member of the team will be in touch

Tel: +44 (0) 800 028 8001

Glasshouse, Alderley Park,
Alderley Edge, Macclesfield,
SK10 4TG, UK

E-mail: info@eurositepower

.co.uk

Tel: +44 (0) 800 028 8001

Glasshouse, Alderley Park,
Alderley Edge, Macclesfield,
SK10 4TG, UK

E-mail: info@eurositepower.co.uk