Client: Blackpool Teaching Hospitals (NHS Foundation Trust)
Gross CO2 saved from May ’14 to Mar ’22
Energy saving from May ’14 to Mar ’22
Electricity generated from August ’16 to Mar ’22
Heat generation from August ’16 to Mar ’22
Reduce energy and CRC costs
Electricity – lighting and power for public areas, bedrooms, and hotel facilities
Heat – hot water production for space heating and leisure facilities
Air conditioning systems – used to keep rooms and whole complex cool
Wide range of facilities operating 24/7
Remove the old CHP unit while plant should have been kept operational throughout the installation
New CHP had to be setup to operate correctly alongside the hospitals stand-by generator
Installation had to be live tested before the handover
Implemented: “On-Site Utility Solution”
Implemented: “EuroSite Power On-Site Utility Solution”
Inverter equipped CHP technology allows output to match demand and maintain efficiency
Integrated CHP and stand-by generator control
Installed: 100 kilowatt Combined Heat and Power (CHP)
Tel: +44 (0) 800 028 8001
Glasshouse, Alderley Park,Alderley Edge, Macclesfield,SK10 4TG, UK
E-mail: info@eurositepower
.co.uk
E-mail: info@eurositepower.co.uk