CLIFTON HOSPITAL, LYTHAM ST. ANNES

Healthcare

Project Details

Client: Blackpool Teaching Hospitals (NHS Foundation Trust)

Facilities:

Download Case Study PDF

Gross CO2 saved from May ’14 to Mar ’22

Energy saving from May ’14 to Mar ’22

Electricity generated from August ’16 to Mar ’22

Heat generation from August ’16 to Mar ’22

GOALS

Reduce energy and CRC costs

Electricity – lighting and power for public areas, bedrooms, and hotel facilities

Heat – hot water production for space heating and leisure facilities

Air conditioning systems – used to keep rooms and whole complex cool

CHALLENGES

Wide range of facilities operating 24/7

Remove the old CHP unit while plant should have been kept operational throughout the installation

New CHP had to be setup to operate correctly alongside the hospitals stand-by generator

Installation had to be live tested before the handover

SOLUTIONS

Implemented: “On-Site Utility Solution”

Implemented: “EuroSite Power On-Site Utility Solution”

Inverter equipped CHP technology allows output to match demand and maintain efficiency

Integrated CHP and stand-by generator control

Installed: 100 kilowatt Combined Heat and Power (CHP)

Request a callback today and a member of the team will be in touch

Tel: +44 (0) 800 028 8001

Glasshouse, Alderley Park,
Alderley Edge, Macclesfield,
SK10 4TG, UK

E-mail: info@eurositepower

.co.uk

Tel: +44 (0) 800 028 8001

Glasshouse, Alderley Park,
Alderley Edge, Macclesfield,
SK10 4TG, UK

E-mail: info@eurositepower.co.uk